The Wu Yi Expressway Anfengying Interchange overpass crosses the Anchu Expressway, with six lanes in both directions and a design speed of 100 km/h. The steel box girders total 10,000 tons. The main line bridge's fourteenth span steel box girders on both sides are 45+60+45m, single-box five-cell fully welded steel box girders, with a standard height of 2.7m and a full top plate width of 18.89~24.88m. The C ramp 1 bridge's fifth span steel box girder is 45+60+45m; the G ramp 1 bridge's third span steel box girder is 45+60+45m, single-box double-cell fully welded; the C ramp 2 bridge's fourth span steel box girder is 35+38+35m, single-box four-cell fully welded. The C ramp 2 bridge uses top-launch construction, while the remaining steel box girders are installed using a truck crane.