The project is part of the Kunming Second Ring Road Shihu Interchange to Daguanhe Bridge section elevated road improvement project, with a total length of approximately 6.2 kilometers. The project involves the replacement of all elevated bridge slabs, major repairs to the ground level, and the construction of a new FD ramp. This included the removal of 4685 old bridge slabs, the construction of 6 cast-in-place box girders, and the construction of 3022 new I-shaped steel-concrete composite girders. The FD ramp uses a steel-concrete composite steel box girder structure. The project achieved the rapid lifting and installation of steel-concrete composite girders to replace the original hollow slabs on the elevated road and four ramp bridges from the Second Ring Road Shihu Interchange to the Daguanhe Bridge section.