The project is located in Guangtong Town, Chuxiong Prefecture, Yunnan Province. The superstructure of this project uses a 2*20m ordinary cast-in-place concrete box girder for the first span, a 13.92+28.5m steel box girder for the second span, and a 2*28.5+17.306m steel box girder for the third span; the bridge is located on a hillside, with a steel box girder operating radius R of 60 meters. The construction conditions are complex, involving small-radius hoisting operations. The steel box girders are assembled on-site into hoisting sections, and then hoisted into place using two 350-ton truck cranes.